Welcome to visit us!

[email protected]
logo logo

Drying Sludge Beds

the beds are about 15 m x 30m in plan and are surrounded by brick walls rising about 1 m above the sand surface.The sewage sludge from the digestion tank is brought and spread over the top of the drying beds to a depth of about 20 to 30 cm.

Copyright© 2020 FUMINE machinery.All rights reserved.Sitemap